Warren County Funded Projects

FEDERAL (80%)/STATE (15%)  AID PROJECTS

Site
PROJECT
COST
DATE COMPLETED

Corinth Road - Main Street Corridor in the Town of Queensbury and City of Glens Falls

Total reconstruction, upgrade utilities, and widen to 3 lanes


$12.654 Million

2008-2010

Middleton Bridge over the Schroon River in the Towns of Bolton and Warrensburg

Possible bridge replacement

1.793 Million

 

2009

Tannery Road Bridge over Stony Creek in the Town of Stony Creek

Bridge Replacement

1.447 Million

2008

Grist Mill Road Bridge over Stony Creek in the Town of Stony Creek

Bridge Replacement

1.103 Million

2008

Woolen Mill Bridge (Milton Street) over the Schroon River in the Town of Warrensburg

Bridge Replacement

2.893 Million

2008

Beach Road in the Town and Village of Lake George

Reconstruction, utility and drainage upgrade and multi modal safety improvements

5.002 Million

2010

Harrington Road Bridge over Mill Creek in the Town of Johnsburg

Possible bridge replacement

1.055 Million

2010

Alder Brook Road Bridge over Trout Brook in Chestertown

Possible bridge replacement

1.469 Million

2008

 

Download Plug-in
Some of the links on this page require a plug-in to view them. Links to the plug-ins are available below.

Adobe Acrobat (PDF)
Adobe Reader Logo
This page
Valid HTML 4.01 TransitionalValid CSS! Level Double-A conformance icon, 
          W3C-WAI Web Content Accessibility Guidelines 1.0